Our products:vertical turbine pump, vertical wet pit pump, vertical oil sump pump, vertical condensation pump, right Angle gearbox
Chinese WeChat

CONTACT US

Hunan Perfect Industry Co.,Ltd

Contact: Manager Hu, Manager Yi

Hotline:008618507312158

Cell phone:008613974960765

Address:Xiangyin County Industrial Park, Yueyang City, Hunan Province, China

Current location: HOME »Knowledge »vertical turbine pump

Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps)
DATE:2024/11/20 17:34:34
visits:
Release Source:China Vertical Turbine Pump Manufacturers and global Pump suppliers Perfect Industry

 Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps)

Inlet flow disturbances, such as swirl, unbalance in the distribution of velocities and pressures, and sudden variations in velocity can be harmful to the hydraulic performance of a Canned Vertical Turbine Pump (double casing vertical barrel centrifugal pump) , its mechanical behavior, and its reliability.

The minimum required straight pipe length (L2) before pump suction inlet is specified.

The straight pipe section is to be the same diameter as that of the Canned Vertical Turbine Pump (double casing vertical barrel centrifugal pump) section nozzle.

The pipe length L2 depends on the distance between suction nozzle and hydraulic inlet L1 and on the Can inner diameter øD1.

Inlet Piping Requirements Of The Canned Vertical Turbine Pumps (double casing vertical barrel centrifugal pumps).jpg